Wednesday, 10 July 2013

Is inadequate sewage infrastructure blocking the flow of new housing delivery?




The pro-development approach of the NPPF has helped to bring about rapid new growth in housing development in some parts of England.  This resurgence is involving sites, more often than not, in locations that are not allocated for housing, or indeed any development.

This can, in some places, put new pressures on infrastructure and the planning system has its ways and means, through CIL (for the moment!) and Section 106 agreements, to address these impacts.

One area of infrastructure untouched by such measures, however, is the local sewage network.

Section 106 of the Water Industry Act 1991 places a duty on water authorities to accept new connections to their sewage systems.  Their ability to reject such connections is limited to very specific circumstances, such as where the connecting pipe does not meet the requisite standards. 

The practical effect of this is therefore that, on payment of a relatively low fixed fee, a developer may connect to a mains sewer regardless of whether the sewer system has the capacity to accommodate the additional flows.  

The water authority therefore has no means of stopping the system becoming overloaded.  Of course, if it does get overloaded and foul water escapes from the sewage system, the water authority is liable of a criminal offence under Section 85 of the 1991 Act and European law.

The duty to make sure that the system can cope with the demands placed upon it falls squarely on the water authority.

Section 94 of the 1991 Act requires water authorities to provide, improve and extend the system of public sewers so as to ensure that the area is effectually drained. 

Unless drainage works are required to serve a single development alone (rather than, say, improvement of existing mains infrastructure) the cost of such improvement works falls on the water authority itself.

Given that this almost certainly involves new infrastructure and considerable spending, forward planning of requirements is essential. 

In this regard, the development plan identifies anticipated housing growth and locations and the SHLAA will give some clear indication of likely housing pressures for the future.  We are told that the water authorities take all of these into account in their infrastructure plans - so if housing is in the planning pipeline, then there should be the pipelines to accommodate it.

The housing growth that we are seeing at the moment is however, to a significant extent, not in locations anticipated by development plans and so in many places the infrastructure plans are inadequate or out of sync with actual development. 

Insofar as the water authorities have no real powers themselves to stop or delay development, the planning system has, in some locations, stepped in to assist.  This is typically done through Grampian conditions that require there to be sewage capacity to be demonstrated before new houses are occupied.

Eminently sensible, one might say.  Except of course that the effect of such a condition is in all too many cases, a ransom position in the favour of the water authority. 

They are described as “authorities” but the reality is of course that they are private companies with a duty to make profits for their own shareholders.  They have no real interest in delivering new housing or the jobs that it brings or any particular desire to be forced into building new, un-forecast sewage infrastructure that will impact on forecast profit levels.  They cannot be criticised for that – it is the logical effect of their privatisation all those years ago.

What is more concerning is that the water authorities have become increasingly aware of the position of power they hold in respect of large planning applications and seem to be seeing this as a lucrative new revenue stream.

Knowing that a Grampian condition is a real problem for housing developers, most water authorities now charge fees of several hundred pounds for telling you what existing capacity levels are at.  One would really have thought they would have such data at the tips of their fingers.

If that is not bad enough, if it is determined that there is a shortfall in capacity, they will charge many thousands of pounds to scope out what works are required to address it.

In such cases the water authorities know that developers won´t and can´t just take a Grampian condition and sit and wait for them to undertake the necessary improvements to the sewage system.  Instead, a simple choice is presented – the developer pays to get the improvements early, or the development can´t go ahead. 

At no stage does the duty under Section 94 of the Act, for the water authorities themselves to meet the local drainage needs, seem to come into play.

To some, this is a pragmatic way of bringing forward new infrastructure at the cost of those who will benefit from it.  To others, it looks like pure and simple cash generation by greedy water companies.

Whatever your point of view, this disconnect between development aspirations and certainty of mains sewage infrastructure presents a major blockage to the actual delivery of much needed housing.
Some local planning authorities have shown their mettle by refusing to impose conditions on new development requiring sewage capacity to be demonstrated.

  The stark choice for the water authority in such circumstances is to bring forward the necessary improvements or face overflow problems and the fines that will result.  However, that local authorities should have to risk sewage overflow to get the water authorities to act is not exactly a vote winner with the electorate. 

It is clear that government has to take a look at this and find a more workable, efficient and cost effective means of delivering the sewage infrastructure required for this new wave of development that it is encouraging.  Sewage is not something that one can brush under the carpet, Mr Pickles.


Tuesday, 29 January 2013

Development Plans - Is it time they joined the dodo?




The development plan has been the cornerstone of planning decisions for as long as most people can remember.  As students we were always taught that the development plan and planning decisions were inseparable – a mantra reinforced by successive changes to legislation that have placed development plans as the starting point for all decisions.

Yet in recent years the development plan seems in many places to have lost its place on the desk of development control officers.  That’s not to say that development plans have ever been a ‘must read’ for development control planners – in my experience, many planners outside of local plan departments have never really held much regard for the development plan.  However, as development control officers have moved into a new era of development management, the disconnect has become more pronounced.

The criticisms of development plans are well rehearsed, but still worth repeating.   Despite protestations from the Clear English society, most plans remain woolly, cut and paste jobs of badly worded national guidance but with inferior grammar.  Not current national guidance, of course.    As development plans take an unfeasibly long time to prepare they are typically inconsistent with prevailing nationalguidance within weeks of being published.

The strength of development plans ought to be in providing a clear steer on local development.  However, all too often the assessments of employment land, retail need and housing numbers upon which they are based are woefully out of date.  Even when they arenot, they often display a dazzling ignorance of the real world.

Almost every development plan zones vast areas of land for inward industrial investment despite the fact thateven our indigenous manufacturing is on the wane. Virtually no development planin the country identifies areas for trade counters and car garages even though they form a significant part of our traditional industrial areas.   Large sites continue to be allocated for bulky goods retailing when anyone in the industry will tell you that in many regions of the UK there is now significant oversupply of space for such activities.

The lack of commerciality indevelopment plans and in some development plan departments is truly astounding.  

Indeed, the only commerciality that seems to stray into the ivory towers of local plan departments these days seems to be where local authority land is concerned.  That the local authority owns a site apparently makes it ideal for all sorts of valuable development. 

So where does the effort in preparing local plans go?   I am sure that there are some officers working incredibly hard behind the scenes to put these documents together.  However, one really has to question the balance of effort expended between the content and the branding, inane photographs and translating the index into multifarious languages.  

While there has always been a question mark over the realism of development plans, prior to the 2004 Planning and Compensation Act there was at least the opportunity to bring areality check to the plans through cross examination of local plan officers and objectors at local plan inquiries. 

The fear of having to defend policies at inquiry against the onslaught of a rabid QC was a sure-fire incentive to make sure that the policies and allocations of a plan were written with a semblance of sense.   It was bloody and painful but the end result was a plan that, at least for the few months following its adoption, could be said to be reasonably realistic.

If the Local Plan inquiry was Schwarzenegger then the LDF / LDP process that came in following the 2004 Act was Mr Muscle. On a bad day.

The Local Plan system was ano holds barred investigation into whether the draft plan was the best that could be achieved.  The LDF system (Yes I know it has been renamed, but it is still the LDF to many..) starts with the assumption that the draft plan is the best that can be achieved and challenges objectors to prove that it isn’t “sound”.   Pure Sir Humphrey.

With some limited exceptions, the choice for the Inspector is accept the plan, kick part of it out or kick it all out.  

In other words, the Inspector’s role is now not to facilitate delivery of the best plan for an areabut to test whether the plan is bad enough to be binned. 

In my experience of the‘new’ system Inspectors and objectors do have a fair stab at scrutinising the local planning authority’s case.  It is however a poke with a tickling stick rather than the cleaving of the broadsword of the previous system. 

The result is that many ofthe plans coming through the system are not a sound platform for future development but glossy brochures of meaningless, anodyne drivel that is out of date the day it is published and woefully out of touch with either what business and developers or local people want and need.

The yawning reality gap leftby development plans is now being filled, in England, by neighbourhood plans.  Despite the requirement that a neighbourhood plan complies with the development plan for an area, in those areas where they are being progressed you would be forgiven for thinking that they are designed to replace it. 

It seems then that the development plan in its current form is an endangered species – and while development plans officers remain in their ivory towers oblivious to the real world around them, it is not a species that many people outside of local plans departments are particularly keen to protect. Unless something is done quickly to make the development plan system up to date, relevant and realistic, then it is surely headed the way of the dodo.